June 1, 2026: Machines Move Dirt Onsite
In a new wave of activity, machines move dirt on site at Damen Silos. Concrete blocks are piled near the Damen overpass, and piles of dirt are made nearby.
Meanwhile, floating docks are prepared for the construction of the Lake Street Bridge in the adjacent Santa Fe Slip, located on the east side of the Silos property. MAT is a subcontractor on the bridge contract, paid to provide a construction location.
