Demolition of the tower continues in tandem with the remainder of the last silo. Work at this height moves more slowly, leaving behind a gaping hole.
Meanwhile, bricks from the building along the Santa Fe Slip are packaged for storage. As a condition of the federal demolition permit, the bricks must be saved and integrated into a future riverfront path.
