Sept 5: Filled Silo Slows Work, Contents Trucked Offsite

Work on the Silos has been slow this week. One silo is filled with an unknown substance, and dozens of trucks are circulating to move it offsite. The weather was particularly windy, which posed additional challenges to keeping dust down. Cracks in the wall facing the river are slightly larger, but not substantially changed.

Siguiente
Siguiente

Aug 29: Demolition Reaches Riverfront Wall