July 25: Center Silos Worked from All Sides

Work continues on the center silo.  The North (image w/ fence and red Heneghan containers), East, and South facing sides of the silos are almost completely down along with large sections of the roof structure.  

Previous
Previous

July 29: Center Silo is Down to its Core

Next
Next

July 22: 6th of 7 Silos on South Face opened