June 27: City Announces Demolition Plan
According to Chicago Department of Public Health, Demolition will begin with the metal building nearest 29th St (Bldg 4). The other metal building will be next (Bldg 5), followed by the Silos at the center of the lot (Bldg 2), the red brick building (Bldg 3), and the Silos directly on the water (Bldg 1).