Aug 28: Paint begins on Lake Street Bridge

The Silos site condition is largely stabilized as work on the Lake Street Bridge continues. Paint begins on the West Leaf of the bridge.

Anterior
Anterior

Sep 26: Lake Street Bridge Departs Damen Silos

Siguiente
Siguiente

Aug 19: 2nd Court Hearing